For more than 35 years, the engineers of WULFENIA-Engineering GmbH have successfully supported our customers in the planning, installation, commissioning and servicing of process engineering plants, covering the entire life cycle of plant technology.

Experienced employees with professional competence and high quality standards develop efficient solutions on site through cooperation with customers, suppliers and workers in a spirit of trust; these are solutions which enable the plant to be realized on schedule and make for smooth commissioning and continuous operation.

Wulfenia EngineeringProject overview

Biomass plants
Country City Plant Period Project
Belgium Wielsbeke Biomass combined heat and power plant (CHP) 2020-2021 Commissioning and plant operation of boiler, water-steam circuit and process steam extraction for the wood industry incl. all auxiliary systems like flue gas cleaning, ash removal or silos
Poland Warsaw/Siekierki Biomass power plant 2019-2021 Warranty support
Ireland Nobber Biodiesel plant 2019 Site management and commissioning of overall plant
Germany Stendal Biomass power plant 2018 Site management and QA/QC as part of the pipe replacement of the recovery and biomass (bark) boiler
Germany Mannheim Biomass power plant 2017-2018 Commissioning of boiler and water-steam circuit as part of the refurbishment of the biomass boiler
France Rambervillers Biomass combined heat and power plant (CHP) 2017-2018 Training of operating personnel
France Gardanne Biomass power plant 2017 Commissioning of overall plant in the field of electrical, control & instrumentation (EC&I) engineering as part of the coal to biomass conversion
Austria Strass/Leibnitzerfeld Biogas plant 2017 Commissioning of a biogas plant with a thermochemical treatment of digestate
England Widnes Biomass combined heat and power plant (CHP) 2016-2018 Commissioning and optimization of overall plant incl. water treatment (moving grate); warranty support
Poland Warsaw/Siekierki Biomass combined heat and power plant (CHP) 2016-2017 Project management of the coal to biomass power plant conversion
Sweden Mjölby Biomass power plant 2015-2017 Commissioning of overall plant (bubbling fluidized bed (BFB) combustion)
USA Kauai Biomass power plant 2015-2016 Commissioning and optimization of overall plant
Belgium Wanze Bioethanol plant 2014 Troubleshooting of multiple double dump valves
South Korea Donghae Biomass power plant 2013-2014 Commissioning of overall plant (circulating fluidized bed (CFB) combustion)
Romania Radauti Biomass power plant 2013-2014 Commissioning of grate firing and hot-gas extraction (drying process for particleboard manufacturing)
Italy Crotone Biomass power plant 2012-2013 Commissioning of firing system, boiler and water-steam circuit
Italy Enna Biomass power plant 2012-2013 Site management; support of the overall project management
Germany Ulm Biomass combined heat and power plant (CHP) 2012 Commissioning of boiler and water-steam circuit
Germany Zwickau Biomass combined heat and power plant (CHP) 2012 Commissioning of overall plant
Germany Hemschlar/Wittgenstein Biomass combined heat and power plant (CHP) 2011 Plant operations support
Switzerland Wallisellen/Aubrugg Biomass combined heat and power plant (CHP) 2010-2011 Commissioning (management) of bubbling fluidized bed (BFB) combustion, boiler, water-steam circuit, turbine and district heating system
Germany Karlsruhe/Maxau Biomass combined heat and power plant (CHP) 2009-2010 Commissioning of circulating fluidized bed (CFB) combustion, boiler and water-steam circuit
Sweden Umea Biomass combined heat and power plant (CHP) 2009 Commissioning of overall plant
Germany Brunsbüttel Biogas plant 2008-2010 Project management for the extension of the tank farm and basic engineering of the biogas plant
Germany Delitzsch Biomass power plant 2008 Commissioning of overall plant (grate firing system)
Brazil Telemaco Borba Biomass power plant 2008 Commissioning of overall plant
Germany Wittenberg/Priesteritz Biomass combined heat and power plant (CHP) 2008 Commissioning of overall plant (circulating fluidized bed (CFB) combustion)
Brazil Monte Alegre Biomass combined heat and power plant (CHP) 2007-2009 Commissioning of overall plant
Slovenia Celje Biomass combined heat and power plant (CHP) 2007-2008 Commissioning of overall plant
Netherlands Moerdijk Biomass power plant 2007-2008 Commissioning of fluidized bed combustion (FBC) and flue gas cleaning system
Germany Eberswalde Biomass combined heat and power plant (CHP) 2007 Commissioning of overall plant
Germany Hückelhoven Biomass combined heat and power plant (CHP) 2007 Commissioning of overall plant
Germany Berlin/Neukölln Biomass combined heat and power plant (CHP) 2006-2007 Commissioning of overall plant (moving grate firing system)
Germany Schkölen Biomass combined heat and power plant (CHP) 2006 Commissioning of overall plant
Germany Fankfurt/Fechenheim Biomass combined heat and power plant (CHP) 2004-2006 Commissioning of grate firing system, boiler and water-steam circuit
Germany Neuwied/Flohr Biomass combined heat and power plant (CHP) 2004-2005 Commissioning of overall plant
Germany Flörsheim/Wicker Biomass combined heat and power plant (CHP) 2004 Shift management during commissioning of overall plant
Coal-fired power plants
Country City Plant Period Project
Czech Republic Trmice Coal-fired power plant 2020-2021 Commissioning (management) for electrical, control & instrumentation (EC&I) systems and process engineering as part of the flue gas desulfurization (FGD) refurbishment
Poland Warsaw/Zeran Coal-biomass co-firing power plant 2020-2021 Commissioning of boiler and water-steam circuit
Turkey Can Lignite-fired power plant 2020 Commissioning of wet flue gas desulfurization (FGD) unit downstream of fluidized bed combustion (FBC)
Poland Gryfino/Dolna Odra Hard coal-fired power plant 2020 Final installation inspection and commissioning of flue gas cleaning system
Germany Niederaußem Lignite-fired power plant 2020 Commissioning of carbon dioxid scrubber (pilot system)
Greece Ptolemaida Lignite-fired power plant 2020 Site management of boiler and water-steam circuit
Germany Zeitz Lignite-fired power plant 2020 Site management, QA/QC and coordination for replacement of steam drum water level indicators
Indonesia Lontar/Banten Coal-fired power plant 2019-2021 Commissioning of boiler and water-steam circuit
China Shanghai/Bailongang Coal-fired power plant 2019-2020 Site supervision of erection and commissioning
Germany Hamburg/Wedel Hard coal-fired power plant 2019 Electrical operation engineer
Czech Republic Pocaply/Melnik Lignite-fired power plant 2019 Commissioning of flue gas cleaning system
Poland Opole Hard coal-fired power plant 2018-2019 Commissioning of boiler and water-steam circuit incl. auxiliary systems
Germany Datteln Hard coal-fired power plant 2017-2021 Commissioning of boiler, water-steam circuit, electrical, control & instrumentation (EC&I) systems; construction site office; plant operations support
Pakistan Faisalabad Coal-fired power plant 2017-2019 Installation supervision, commissioning, optimization and warranty support of overall plant (fluidized-bed combustion)
India Meja Thesil Coal-fired power plant 2017 Technical consulting for Hitachi regarding the scope of supply (boiler with oil burners, coal mills and auxiliary systems)
China Zigong/Nine Dragons Coal-fired power plant 2017 Quality Assurance/Quality Control (QA/QC) and expediting for boiler pressure parts
Taiwan Kaohsiung/Talin Hard coal-fired power plant 2016-2020 Commissioning of overall plant
Poland Kozienice Hard coal-fired power plant 2016-2018 Commissioning of flue gas desulfurization (FGD) system and flue gas denitrification system (SCR) as part of the new construction of unit 11
China Jining Hard coal-fired power plant 2016 Commissioning of flue gas denitrification system (SCR)
Romania Lasi Hard coal-fired power plant 2016 Commissioning of flue gas desulfurization (FGD) system
Turkey Milas/Yeniköy-Kemerköy Lignite-fired power plant 2016 Consulting; commissioning of flue gas desulfurization (FGD) system
Poland Danzig Hard coal-fired power plant 2015-2016 Execution and evaluation of acceptance tests and series of measurements during commissioning
Bulgaria Galabovo/Maritza Lignite-fired power plant 2015-2016 Execution and evaluation of acceptance tests and series of measurements during commissioning
Chile Huasco/Guacolda Hard coal-fired power plant 2015-2016 Commissioning of flue gas cleaning system
Poland Jastrzebie Zdroj/Zofiowka Hard coal-fired power plant 2015-2016 Site management
Czech Republic Kadan/Prunerov Lignite-fired power plant 2015-2016 Commissioning and optimization of overall plant in the field of electrical, control & instrumentation (EC&I) engineering
Czech Republic Pocaply/Melnik Lignite-fired power plant 2015 Commissioning of flue gas denitrification systems of units 1 to 6
Poland Bogatynia/Turow Lignite-fired power plant 2014-2021 Commissioning (management) of flue gas desulfurization (FGD) systems of incineration lines 4 to 6; taking care of residual points and defects in the field of electrical engineering
Turkey Koyunagili/Yunus Emre Lignite-fired power plant 2014-2017 Installation and commissioning (management) of circulating fluidized bed (CFB) combustion, boiler and water-steam circuit
Germany Mannheim Hard coal-fired power plant 2014-2015 Commissioning of boiler and water-steam circuit
Czech Republic Karniva/Detmarovice Hard coal-fired power plant 2014 Commissioning of conveyor systems for the dry flue gas desulfurization (FGD) system
Slovenia Sostanj Lignite-fired power plant 2014 Commissioning of boiler and water-steam circuit
Netherlands Rotterdam/Maasvlakte Coal-biomass co-firing power plant 2013-2016 Commissioning of boiler, water-steam circuit, ash removal and flue gas cleaning system of unit 3
Germany Duisburg/Walsum Hard coal-fired power plant 2013-2014 Commissioning (management) of flue gas desulfurization (FGD) and wastewater treatment system of unit 10
Romania Timisoara Hard coal-fired power plant 2013-2014 Commissioning of dry flue gas desulfurization (FGD) system
Chile Tocopilla Hard coal-fired power plant 2012-2014 Commissioning of flue gas cleaning system
Chile Ventanas Hard coal-fired power plant 2012-2014 Commissioning of flue gas cleaning system
Germany Hamburg/Moorburg Hard coal-fired power plant 2011-2017 Commissioning of boiler, water-steam circuit and flue gas cleaning system; construction site office
Germany Hamm/Westfalen Hard coal-fired power plant 2011-2015 Commissioning and optimization of firing system, auxiliary steam generation, water treatment, flue gas cleaning, electrical, control and instrumentation (EC&I) systems, etc.
Germany Lünen Hard coal-fired power plant 2011-2014 Commissioning of flue gas cleaning system; plant operations support and training of operating personnel
Romania Turceni Lignite-fired power plant 2011-2014 Commissioning of flue gas cleaning system
Germany Stuttgart Hard coal-fired power plant 2011-2012 Consulting for Alstom in Stuttgart as part of the project RDK 8 in Karlsruhe
USA Maidsville/Longview Hard coal-fired power plant 2011 Commissioning of boiler and water-steam circuit
Netherlands Eemshaven Hard coal-fired power plant 2010-2019 Site management, specialist site management and commissioning of (mechanical) plant systems, boiler, water-steam circuit, turbines, flue gas cleaning, fuel supply, ash and gypsum removal, etc.
Germany Karlsruhe Hard coal-fired power plant 2010-2014 Commissioning and optimization of firing system, boiler, water-steam circuit and flue gas cleaning system
Poland Belchatow Lignite-fired power plant 2010-2011 Commissioning of boiler and water-steam circuit
Bulgaria Galabovo/Maritza Lignite-fired power plant 2010-2011 Commissioning of boiler and water-steam circuit
Germany Zülpich Lignite-fired power plant 2010 Commissioning of firing system, boiler and water-steam circuit
Germany Wilhelmshaven Hard coal-fired power plant 2009-2018 Specialist site management of sewer construction, air preheater and ash system; commissioning of boiler, water-steam circuit and flue gas cleaning system; QA/QC in the fields of steel construction, sheet metal fabrication, flue gas cleaning, etc.; optimization of instrumentation and control (I&C) systems; warranty support
Germany Neurath Lignite-fired power plant 2009-2013 Site management, commissioning and optimization of boiler, water-steam circuit and flue gas cleaning system of BoA 2 and 3
Czech Republic Tusimice Lignite-fired power plant 2009 Commissioning of flue gas desulfurization (FGD) system
Germany Niederaußem Lignite-fired power plant 2008-2009 Commissioning of flue gas cleaning system
England Warrington/Fiedler Ferry Hard coal-fired power plant 2008-2009 Commissioning of flue gas desulfurization (FGD) system
Germany Bergkamen Hard coal-fired power plant 2008 Commissioning of flue gas desulfurization (FGD) system
Germany Eschweiler/Weisweiler Lignite-fired power plant 2008 Commissioning of topping gas turbines; coordination between instrumentation and control (I&C) and process engineering
Germany Mehrum Hard coal-fired power plant 2008 Commissioning of flue gas desulfurization (FGD) system
Poland Rybnik Hard coal-fired power plant 2008 Commissioning of flue gas desulfurization (FGD) system
China Chizhou/Jiuhua Coal-fired power plant 2007-2008 Commissioning of flue gas desulfurization (FGD) system
Spain Abono Coal-fired power plant 2007 Commissioning of flue gas cleaning system
Germany Hamburg/Wedel Hard coal-fired power plant 2007 General overhaul of flue gas cleaning system; plant operations support
Germany Karlsruhe Hard coal-fired power plant 2007 Recommissioning of flue gas desulfurization (FGD) system
Belgium Kluisbergen/Ruien Hard coal-fired power plant 2006-2007 Commissioning of flue gas desulfurization (FGD) and flue gas denitrification system
Turkey Can Coal-fired power plant 2006 Service (precise calibration of pressure transmitters)
Germany Voerde Hard coal-fired power plant 2004-2006 Commissioning of flue gas desulfurization (FGD) system
China Ruiming Hard coal-fired power plant 2003-2004 Site management and commissioning of flue gas desulfurization (FGD) system
Germany Nuremberg Hard coal-fired power plant 2002 Commissioning of dry flue gas desulfurization (FGD) system of incineration lines 1 and 2
Denmark Avedoere Coal-biomass co-firing power plant 2001-2002 Commissioning of flue gas cleaning system with gypsum recovery
Greece Megalopolis Lignite-fired power plant 1999-2002 Commissioning of flue gas cleaning system
Belgium Genk/Langerlo Hard coal-fired power plant 1998-2000 Commissioning of flue gas desulfurization (FGD) system
Germany Spremberg/Schwarze Pumpe Lignite-fired power plant 1996-1998 Commissioning of flue gas cleaning system
Germany Jänschwalde Lignite-fired power plant 1994-1997 Commissioning of twelve flue gas desulfurization (FGD) systems
Germany Boxberg/Oberlausitz Lignite-fired power plant 1993-1994 Pipe installation and commissioning of flue gas desulfurization (FGD) system
Croatia Plomin Hard coal-fired power plant 1992-1994 Installation and commissioning of flue gas desulfurization (FGD) system
Germany Walheim Coal-fired power plant 1987-1989 Commissioning of flue gas cleaning system
Germany Ensdorf Hard coal-fired power plant 1987-1988 Commissioning of flue gas cleaning system
Germany Schwandorf Hard coal-fired power plant 1987-1988 Commissioning of flue gas cleaning system
Gas and combined cycle
Country City Plant Period Project
Germany Wolfsburg Combined cycle gas turbine power plant (CCGT) 2021 Commissioning of overall plant
Brazil Acu/Novo Tempo Combined cycle gas turbine power plant (CCGT) 2020-2021 Commissioning (management) of overall plant
Germany Frankfurt/Höchst Combined cycle gas turbine power plant (CCGT) (waste heat boiler) 2020-2021 Site management of boiler and water-steam circuit incl. auxiliary systems
Germany Gelsenkirchen/Scholven Combined cycle gas turbine power plant (CCGT) 2020-2021 Project management/site management for electrical, control & instrumentation (EC&I) systems
Germany Pforzheim Gas engine power plant 2020-2021 Management and supervision of commissioning of five gas engines, shell boiler and district heating system; conceptual design and optimization of instrumentation & control (I&C) engineering
Egypt Sidi Salem/Burullus Combined cycle gas turbine power plant (CCGT) 2020-2021 Warranty support for water-steam circuit
Germany Wiesbaden Combined cycle gas turbine power plant (CCGT) 2020-2021 Commissioning of gas turbine plant incl. waste heat boiler
Germany Aalen/Palm Waste heat boiler 2020 Site management of waste heat boiler incl. piping for the process steam supply of paper machines or power generation (gas-fired)
England Kemsley Waste heat boiler (CCGT) 2020 Site management for the steel construction of waste heat boiler incl. auxiliary systems
Germany Plattling Combined cycle gas turbine power plant (CCGT) 2020 Commissioning of overall plant
Germany Unterbreizbach/Werra Combined cycle gas turbine power plant (CCGT) 2020 Commissioning of gas turbine plant incl. waste heat boiler
Germany Berlin/Marzahn Combined cycle gas turbine power plant (CCGT) 2019-2020 Commissioning of boiler and water-steam circuit; plant operations support
China Hongkong Gas power plant 2019-2020 Commissioning of overall plant
Netherlands Terneuzen Boiler plant for process steam generation (gas-fired boiler) 2019-2020 Commissioning of overall plant; plant operations support
Bolivia Warnes Combined cycle gas turbine power plant (CCGT) 2019-2020 Commissioning (management) of overall plant
Israel Alan Tavor Combined cycle gas turbine power plant (CCGT) 2019 Quality Assurance/Quality Control (QA/QC)
Germany Düsseldorf/Henkel Combined heat and power plant (CHP) (oil-/gas-fired boiler) 2019 Commissioning (management) of rebuilt firing system (gas- and oil-fired combination/multi-fuel burner) and new flue gas denitrification system (SNCR)
Bolivia Entre Rios Combined cycle gas turbine power plant (CCGT) 2019 Shift management during commissioning of overall plant
Sudan Garri Combined cycle gas turbine power plant (CCGT) 2019 Commissioning of overall plant
Israel Migdal Haemek/Ramat Gavriel Combined cycle gas turbine power plant (CCGT) 2019 Quality Assurance/Quality Control (QA/QC)
China Yantai Combined cycle gas turbine power plant (CCGT) 2019 Quality Assurance/Quality Control (QA/QC) and expediting for boiler pressure parts and non-pressure parts
Germany Berlin/Lichterfelde Combined cycle gas turbine power plant (CCGT) 2018-2020 Commissioning of overall plant
Germany Kiel Gas engine power plant 2018-2019 Commissioning (management) of overall plant (engine, cooling systems, exhaust gas system, urea, lubricant and waste oil, etc.)
Bolivia Yacuiba/Del Sur Combined cycle gas turbine power plant (CCGT) 2018-2019 Mechanical commissioning (management) of overall plant
Thailand Chana Combined cycle gas turbine power plant (CCGT) 2018 Commissioning of overall plant
Netherlands Geleen Waste heat boiler 2018 Basic and detail engineering; Environmental protection act (USG) work preparation
Egypt Sidi Salem/Burullus Combined cycle gas turbine power plant (CCGT) 2017-2019 Commissioning of overall plant
Egypt Beni Suef Combined cycle gas turbine power plant (CCGT) 2017-2018 Commissioning (management) of boiler and mechanical plant systems; warranty support and temporary plant operation
Bangladesh Sirajganj Combined cycle gas turbine power plant (CCGT) 2017 Commissioning of gas turbine
Saudi Arabien Al-Qurayyat Combined cycle gas turbine power plant (CCGT) 2016-2017 Commissioning (management) of gas turbine incl. auxiliary systems
Bangladesh Ashuganj Combined cycle gas turbine power plant (CCGT) 2016-2017 Commissioning (management) of gas turbine, steam turbine, generator, switchgear and instrumentation & control (I&C) systems
Germany Burgkirchen/Gendorf Combined cycle gas turbine power plant (CCGT) 2016 Commissioning of waste heat boiler and water-steam circuit
Malta Marsaxlokk/Delimara Combined cycle gas turbine power plant (CCGT) 2016 Site management
Germany Cologne/Godorf Combined cycle gas turbine power plant (CCGT) 2015 Commissioning of overall plant
Poland Plock Combined heat and power plant (CHP) (oil-/gas-fired boiler) 2015 Commissioning of flue gas cleaning system of one gas-fired and seven oil-fired boilers
Belgium Antwerp Boiler plant for process steam generation (gas-fired boiler) 2014-2015 Commissioning of firing system, boiler and water-steam circuit
Poland Przyjazn Blast furnace gas power plant 2014-2015 Commissioning of firing system, boiler and water-steam circuit
Austria Vienna/Arsenal District heating plant (oil-/gas-fired hot water boiler) 2014-2015 Commissioning of overall plant
Malaysia Bintulu Boiler plant for process steam generation (gas-fired boiler) 2014 Commissioning of firing system, boiler and water-steam circuit
Kuwait Az-Zour Combined cycle gas turbine power plant (CCGT) 2013-2014 Commissioning of water-steam circuit, steam turbine and mechanical plant systems
Germany Eisenhüttenstadt Blast furnace gas power plant 2012-2013 Commissioning of firing system, boiler and water-steam circuit of unit 7
Germany Hattorf Combined cycle gas turbine power plant (CCGT) 2012-2013 Commissioning of boiler and water-steam circuit
Germany Lingen Combined cycle gas turbine power plant (CCGT) 2012-2013 Site management
Germany Wesseling Gas power plant (oil-/gas-fired boiler) 2012-2013 Commissioning of boiler and water-steam circuit as part of the new construction of boiler 7 and 8
Germany Werne/Gersteinwerk Combined cycle gas turbine power plant (CCGT) 2011-2012 Site management
Austria Fernitz/Mellach Combined cycle gas turbine power plant (CCGT) 2011 Commissioning of waste heat boiler and water-steam circuit
Germany Hannover/Linden Combined cycle gas turbine power plant (CCGT) 2011 Commissioning of gas turbine, boiler and water-steam circuit
Netherlands Rotterdam/Enecogen Combined cycle gas turbine power plant (CCGT) 2011 Plant operations support and training of operating personnel
Trinidad & Tobago La Brea Combined cycle gas turbine power plant (CCGT) 2010-2011 Commissioning (management) of overall plant
Netherlands Rotterdam/Rijnmond Combined cycle gas turbine power plant (CCGT) 2010 Management and execution of the acceptance tests
France Carling/Emile Huchet Combined cycle gas turbine power plant (CCGT) 2009-2010 Commissioning of gas turbine, boiler and water-steam circuit
Germany Dillingen/Saar Blast furnace gas power plant 2009-2010 Commissioning of overall plant; plant operations support and training of operating personnel
Belgium Gent Blast furnace gas power plant 2009-2010 Commissioning of boiler and water-steam circuit
Austria Linz Blast furnace gas power plant 2009-2010 Commissioning of boiler and water-steam circuit
Netherlands Ritthem/Slocentrale Combined cycle gas turbine power plant (CCGT) 2009 Commissioning of overall plant
Bangladesh Mymensingh Combined cycle gas turbine power plant (CCGT) 2008-2009 Warranty support of electrical, control and instrumentation (EC&I) systems
France Pont-sur-Sambre Combined cycle gas turbine power plant (CCGT) 2008-2009 Commissioning (management) of overall plant
Vietnam Ca Mau Combined cycle gas turbine power plant (CCGT) 2008 Commissioning of overall plant
Germany Hamburg/Tiefstack Combined cycle gas turbine power plant (CCGT) 2008 Construction supervision and coordination of air condenser and gas pipeline construction activities; plant operations support
Germany Herdecke Combined cycle gas turbine power plant (CCGT) 2008 Commissioning of boiler and water-steam circuit
Austria Vienna/Simmering Combined cycle gas turbine power plant (CCGT) 2008 Shift management during commissioning of overall plant
Germany Irsching Combined cycle gas turbine power plant (CCGT) 2007-2009 Commissioning of overall plant
Egypt Atfih/El Kureimat Combined cycle gas turbine power plant (CCGT) 2007-2008 Commissioning of overall plant
Germany Hamm/Uentrop Combined cycle gas turbine power plant (CCGT) 2007-2008 Commissioning of overall plant
Romania Bucharest Gas power plant 2007 Commissioning and optimization of oil and gas burners; operation of boiler and water-steam circuit
Egypt Cairo Combined cycle gas turbine power plant (CCGT) 2007 Commissioning of overall plant
Italy Termoli Combined cycle gas turbine power plant (CCGT) 2006-2007 Commissioning of gas turbine, boiler, water-steam circuit and steam turbine
Denmark Copenhagen/Amager Combined heat and power plant (CHP) (oil-/gas-fired boiler) 2001-2002 Commissioning of flue gas cleaning system
Waste-to-energy plants
Country City Plant Period Project
Germany Premnitz Waste-to-energy plant (WTE) 2021 Commissioning of boiler and water-steam circuit incl. auxiliary systems
Netherlands Rotterdam Hot asphalt recycling plant 2020-2021 Commissioning of waste heat boiler with integrated secondary combustion chamber downstream of a rotary kiln
Spain San Sebastian Waste-to-energy plant (WTE) 2020-2021 Commissioning of boiler and water-steam circuit incl. auxiliary systems
Turkey Ankara Waste-to-energy plant (WTE) 2020 QA/QC for flue gas denitrification system (SCR), air preheater and fabric filter
Germany Würzburg Waste-to-energy plant (WTE) 2020 Commissioning of firing system, boiler and water-steam circuit of incineration line 3
Germany Schwedt Substitute fuel power plant 2019-2021 Training of operating personnel and plant operations support
Scotland Dundee Waste-to-energy plant (WTE) 2019-2020 Site management of grate firing system, boiler and water-steam circuit
China Taicang/Nine Dragons Substitute fuel power plant 2019-2020 Commissioning of circulating fluidized bed (CFB) combustion, boiler and water-steam circuit
Germany Hamburg Waste-to-energy plant (WTE) 2019 Site management for refurbishment of waste-fired boiler
Germany Schwarzheide/BASF Residue incineration plant 2019 Commissioning of flue gas cleaning system downstream of two rotary kiln
Netherlands Delfzijl Waste-to-energy plant (WTE) 2018-2019 Commissioning and optimization of overall plant (grate firing system)
England Edinburgh Waste-to-energy plant (WTE) 2018-2019 Commissioning of overall plant; plant operations support and training of operating personnel
Germany Leverkusen Waste-to-energy plant (WTE) 2018-2019 Specialist site management and commissioning of plant systems; installation supervision of automatization systems; warranty support service
China Quzhou Waste-to-energy plant (WTE) 2018-2019 Production monitoring; QA/QC
Thailand Ratchaburi/Ban Pong Substitute fuel power plant 2017-2019 Site management and commissioning supervision of bubbling fluidized bed (BFB) combustion, boiler and water-steam circuit
England King’s Lynn/Palm Paper Waste-to-energy plant (WTE) 2017-2018 Commissioning of overall plant; warranty support
Scotland Speyside Waste-to-energy plant (WTE) 2016-2018 Commissioning of firing system, boiler and water-steam circuit; taking care of residual points and defects
Switzerland Geneva Waste-to-energy plant (WTE) 2016-2017 Overhaul (management)
England Herefordshire/Worcestershire Waste-to-energy plant (WTE) 2016-2017 Commissioning of overall plant; plant operations support and training of operating personnel
Hungary Komarom Waste-to-energy plant (WTE) 2016-2017 Commissioning of flue gas cleaning system (fabric filter)
Netherlands Moerdijk/Attero Waste-to-energy plant (WTE) 2016-2017 Commissioning (management) of overall plant (grate firing)
China Peking/Haidan Waste-to-energy plant (WTE) 2016-2017 Commissioning of firing system, boiler and water-steam circuit
Czech Republic Karvina Waste-to-energy plant (WTE) 2016 Commissioning of conveyor systems for the dry flue gas desulfurization (FGD) system
Finland Varkaus/Riikinvoima Waste-to-energy plant (WTE) 2016 Commissioning of circulating fluidized bed (CFB) combustion, boiler and water-steam circuit
Germany Frankfurt/Höchst Substitute fuel power plant 2015-2019 Plant operations support
Poland Bialystok Waste-to-energy plant (WTE) 2015-2016 Commissioning of overall plant (grate firing)
Poland Krakow Waste-to-energy plant (WTE) 2015-2016 Commissioning of overall plant (grate firing system)
Poland Poznan Waste-to-energy plant (WTE) 2015-2016 Commissioning of overall plant (grate firing system)
England South Gloucestershire/Severnside Waste-to-energy plant (WTE) 2015-2016 Shift management during commissioning of overall plant (grate firing system)
England Knottingley/Ferrybridge Waste-to-energy plant (WTE) 2014-2015 Commissioning of overall plant
Switzerland Lucerne Waste-to-energy plant (WTE) 2014-2015 Commissioning of flue gas cleaning system
England Manchester/Runcorn Waste-to-energy plant (WTE) 2014-2015 Commissioning of grate firing systems, boilers, water-steam circuits and flue gas cleaning systems (four incineration lines)
England Plymouth Waste-to-energy plant (WTE) 2014-2015 Commissioning of overall plant
Switzerland Sisseln Waste-to-energy plant (WTE) 2014-2015 Commissioning of moving grate firing system, boiler and water-steam circuit
England Cleveland/Teesside Waste-to-energy plant (WTE) 2013-2014 Commissioning of grate firing system, boiler and water-steam circuit of incineration lines 4 and 5
Sweden Sigtuna/Brista Waste-to-energy plant (WTE) 2013-2014 Commissioning of boiler, water-steam circuit and flue gas cleaning system
Italy Bolzano Waste-to-energy plant (WTE) 2013 Commissioning of grate firing, water-steam circuit and flue gas cleaning system
Switzerland Bern Waste-to-energy plant (WTE) 2012-2013 Shift management during commissioning of overall plant (grate firing)
Belgium Oostende Substitute fuel power plant 2012 Coordination and execution of the overhaul
China Tianjin Waste-to-energy plant (WTE) 2011-2013 Commissioning (management) of overall plant
England Newhaven Waste-to-energy plant (WTE) 2011-2012 Commissioning of grate firing, boiler and water-steam circuit
Qatar Doha/Mesaieed Waste-to-energy plant (WTE) 2011 Commissioning of overall plant
Germany Düsseldorf/Flingern Waste-to-energy plant (WTE) 2011 Site management
Netherlands Harlingen Waste-to-energy plant (WTE) 2011 Commissioning of grate firing, boiler and water-steam circuit
Norway Oslo/Klemetsrud Waste-to-energy plant (WTE) 2011 Commissioning of grate firing, boiler and water-steam circuit of incineration line 3; plant operations support
Hungary Polgar Waste-to-energy plant (WTE) 2011 Commissioning of boiler and water-steam circuit
Austria Zistersdorf Waste-to-energy plant (WTE) 2011 Overhaul (management)
Germany Zorbau Waste-to-energy plant (WTE) 2011 Overhaul (management)
Germany Bernburg/Saale Substitute fuel power plant 2010-2011 Commissioning of grate firing, boiler and water-steam circuit
Switzerland Basel Waste-to-energy plant (WTE) 2010 Plant operations support
Germany Salzgitter Substitute fuel power plant 2010 Commissioning of boiler and water-steam circuit
Germany Frankfurt/Höchst Substitute fuel power plant 2009-2012 Site management; commissioning of overall plant (circulating fluidized bed (CFB) combustion)
Germany Schwedt Substitute fuel power plant 2009-2011 Commissioning of waste pre-treatment facility, fluidized bed combustion (FBC), boiler and water-steam circuit
Netherlands Delfzijl Waste-to-energy plant (WTE) 2009-2010 Site management and commissioning of overall plant
Switzerland Giubiasco Waste-to-energy plant (WTE) 2009-2010 Commissioning of grate firing, boiler, water-steam circuit, fly ash and residue treatment system
Germany Glückstadt Substitute fuel power plant 2009-2010 Commissioning of boiler, water-steam circuit and flue gas cleaning system
Germany Hameln Waste-to-energy plant (WTE) 2009-2010 Commissioning of roller grate firing system, boiler and water-steam circuit of incineration line 4
Germany Heringen Waste-to-energy plant (WTE) 2009-2010 Commissioning of flue gas cleaning system
Germany Mannheim Waste-to-energy plant (WTE) 2009-2010 Commissioning of moving grate firing system, boiler, water-steam circuit and flue gas cleaning system
Germany Wesseling/Basell Waste-to-energy plant (WTE) 2009-2010 Commissioning of flue gas denitrification system (SNCR)
Switzerland Zurich/Hagenholz Waste-to-energy plant (WTE) 2009-2010 Site management of incineration line 2K3
Austria Zwentendorf/Dürnrohr Waste-to-energy plant (WTE) 2009-2010 Commissioning of grate firing, boiler and water-steam circuit of incineration line 3
Germany Bamberg Waste-to-energy plant (WTE) 2009 Commissioning of moving grate firing system, boiler and water-steam circuit; plant operations support
Germany Bitterfeld-Wolfen Waste-to-energy plant (WTE) 2009 Commissioning of boiler and water-steam circuit; plant operations support
Germany Frankfurt/Nordweststadt Waste-to-energy plant (WTE) 2009 Commissioning of boiler and water-steam circuit of incineration lines 3 and 4
Belgium Oostende Substitute fuel power plant 2009 Commissioning of grate firing, boiler and water-steam circuit
Singapore Singapore Waste-to-energy plant (WTE) 2009 Commissioning of overall plant (grate firing system)
Germany Stade Substitute fuel power plant 2009 Commissioning of boiler and water-steam circuit
Netherlands Twence/Hengelo Waste-to-energy plant (WTE) 2009 Commissioning of boiler and water-steam circuit
Germany Zorbau Waste-to-energy plant (WTE) 2009 Overhaul (management)
Netherlands Moerdijk/Attero Waste-to-energy plant (WTE) 2008-2010 Commissioning of grate firing, boiler and water-steam circuit of incineration line 4; warranty support
Germany Bremen Substitute fuel power plant 2008-2009 Site management
England Cleveland/Billingham Waste-to-energy plant (WTE) 2008-2009 Commissioning (management) of grate firing system, boiler and water-steam circuit of incineration line 3
Germany Kassel Waste-to-energy plant (WTE) 2008-2009 Commissioning of flue gas cleaning system; warranty support
Germany Mainz Waste-to-energy plant (WTE) 2008-2009 Installation and commissioning of flue gas cleaning system; construction site office
China Xiamen Waste-to-energy plant (WTE) 2008-2009 Commissioning of grate firing system, boiler and water-steam circuit
Austria Vienna/Pfaffenau Waste-to-energy plant (WTE) 2008 – 2009 Commissioning of grate firing system, boiler and water-steam circuit, flue gas cleaning and wastewater treatment system; construction site office
Germany Hürth/Knapsack Substitute fuel power plant 2008 Commissioning of grate firing system, boiler and water-steam circuit
Germany Stuttgart Waste-to-energy plant (WTE) 2008 Installation and commissioning of flue gas cleaning system
Germany Weener Substitute fuel power plant 2008 Commissioning of boiler and water-steam circuit
Germany Witzenhausen Substitute fuel power plant 2008 Commissioning of circulating fluidized bed (CFB) combustion, boiler and water-steam circuit
Germany Emden Waste-to-energy plant (WTE) 2007-2008 Commissioning of boiler and water-steam circuit
Germany Großräschen Substitute fuel power plant 2007-2008 Commissioning of grate firing system, boiler and water-steam circuit
Germany Solingen Waste-to-energy plant (WTE) 2007-2008 Commissioning (management) of flue gas cleaning system
Netherlands Amsterdam Waste-to-energy plant (WTE) 2007 Commissioning of boiler and water-steam circuit
Norway Trondheim Waste-to-energy plant (WTE) 2007 Commissioning of overall plant (grate firing system)
Germany Zella Mehlis Waste-to-energy plant (WTE) 2007 Commissioning of flue gas cleaning system
China Shanghai/Huancheng Waste-to-energy plant (WTE) 2005-2007 Commissioning and optimization of grate firing system, boiler, water-steam circuit and flue gas cleaning system of incineration line 3
Germany Wuppertal Waste-to-energy plant (WTE) 2005-2006 Commissioning of flue gas cleaning system of incineration lines 35 and 36
France Argenteuil Waste-to-energy plant (WTE) 2005 Commissioning of overall plant (grate firing system)
Germany Erfurt Waste-to-energy plant (WTE) 2004-2006 Commissioning of overall plant
Germany Amsdorf/Romonta Substitute fuel power plant 2004-2005 Commissioning of flue gas cleaning system
Germany Magdeburg Waste-to-energy plant (WTE) 2004-2005 Commissioning of grate firing system, boiler, water-steam circuit and steam turbine
Austria Niklasdorf Waste-to-energy plant (WTE) 2004-2005 Commissioning of flue gas cleaning system
Netherlands Alkmaar Waste-to-energy plant (WTE) 2004 Commissioning of grate firing system and flue gas cleaning system
Germany Lauta Waste-to-energy plant (WTE) 2003-2004 Commissioning of flue gas cleaning system
Germany Mainz/Wiesbaden Waste-to-energy plant (WTE) 2003 Commissioning of flue gas cleaning system
China Shanghai/Huancheng Waste-to-energy plant (WTE) 2002-2005 Site management; commissioning of grate firing system and optimization of the combustion control system of incineration lines 1 and 2
Austria Arnoldstein Waste-to-energy plant (WTE) 2002-2004 Commissioning of overall plant (reciprocating grate firing system)
Sweden Malmö Waste-to-energy plant (WTE) 2002-2003 Commissioning of reciprocating grate firing system, boiler, water-steam circuit and flue gas cleaning system
Portugal Madeira Waste-to-energy plant (WTE) 2002 Commissioning of roller grate firing system, boiler, water-steam circuit and flue gas cleaning system
Germany Würzburg Waste-to-energy plant (WTE) 1999-2000 Commissioning of grate firing system, boiler, water-steam circuit and flue gas cleaning system
Germany Hamburg Waste-to-energy plant (WTE) 1999 Commissioning of hydrochloric acid recovery system
Switzerland Basel Waste-to-energy plant (WTE) 1998-2002 Commissioning of grate firing system, boiler, water-steam circuit and flue gas cleaning system
Germany Fürth Waste-to-energy plant (WTE) 1997-1998 Commissioning of flue gas cleaning system downstream of the smoldering furnace
Germany Göppingen Waste-to-energy plant (WTE) 1996-1998 Commissioning of grate firing system, boiler, water-steam circuit and flue gas cleaning system
Germany Kempten Waste-to-energy plant (WTE) 1996-1997 Installation and commissioning of flue gas cleaning system
Netherlands Nijmegen Waste-to-energy plant (WTE) 1995-1998 Commissioning of grate firing system, boiler, water-steam circuit and flue gas cleaning system
Germany Ingolstadt Waste-to-energy plant (WTE) 1995-1996 Commissioning of flue gas cleaning system
Germany Mannheim Waste-to-energy plant (WTE) 1995-1996 Erection and commissioning of grate firing system, boiler, water-steam circuit and flue gas cleaning system
Germany Stuttgart Waste-to-energy plant (WTE) 1995 Commissioning of flue gas cleaning system
Germany Schweinfurt Waste-to-energy plant (WTE) 1993-1994 Commissioning of flue gas cleaning system
Switzerland Thun Waste-to-energy plant (WTE) 1993-1994 Basic and detail engineering of the water treatment system
Paper and sewage sludge
Country City Plant Period Project
Germany Offenbach Sewage sludge incineration plant 2020-2021 Commissioning of sewage sludge mono incineration plant (rotary kiln)
Germany Wörth/Palm Paper sludge incineration plant 2020 Welding supervision, coordination and documentation as part of the refurbishment of boiler
Germany Bottrop Sewage sludge incineration plant 2018-2019 Commissioning and warranty support of overall plant
Germany Wörth/Palm Paper sludge incineration plant 2018 Site management and QA/QC as part of the power plant outage (membrane tube wall bends, nozzle bottom replacement and air outlet repair)
Germany Ludwigshafen Sewage sludge incineration plant 2012-2015 Project development and commissioning of flue gas cleaning system; optimization of instrumentation and control (I&C) systems
England Manchester Paper sludge incineration plant 2012 Commissioning of overall plant
Austria Hirschwang Paper sludge incineration plant 2004-2005 Commissioning of overall plant
Germany Munich/Gut Großlappen Sewage sludge incineration plant 2000-2001 Warranty support; taking care of residual points and defects
Germany Munich/Gut Großlappen Sewage sludge incineration plant 1996-1998 Commissioning of fluidized bed combustion (FBC), boiler, water-steam circuit and flue gas cleaning system
Switzerland Niederbipp Paper sludge incineration plant 1991-1992 Commissioning of bubbling fluidized bed (BFB) combustion, boiler, water-steam circuit and flue gas cleaning system
Refineries, steel and cement
Country City Plant Period Project
Spain Aviles Steel mill (cooling stack/system) 2020 Commissioning of cooling stack for waste heat utilization in steel production
Belarus Mjory Steel mill (waste heat boiler) 2020 Commissioning supervision of boiler and water-steam circuit
Italy Bari Steel mill (walking beam furnace) 2019 Quality Assurance/Quality Control (QA/QC), document control and expediting for a “walking beam furnace” project
Vietnam Quang Ngai Steel mill (Prozessgasreinigungsanlage) 2019 Commissioning of process gas cleaning system
Austria Linz Steel mill (gas-fired boiler) 2018-2019 Refurbishment of instrumentation & control (I&C) systems as part of the boiler overhaul
Russia Tula Steel mill (waste heat boiler) 2018-2019 Specialist site management for electrical, control & instrumentation (EC&I) systems of the waste-heat boiler incl. water-steam circuit
Germany Duisburg Steel mill (process gas cleaning system) 2018 Commissioning and optimization of process gas cleaning system; plant operations support
Iceland Husavik Submerged arc furnace (SAF) (exhaust gas cleaning system) 2018 Commissioning supervision of exhaust gas cleaning system downstream of two submerged arc furnaces (SAF)
Germany BurglenGenevaeld Cement plant 2017 Commissioning of a silo complex with conveyor system
China Taiyuan/Tisco Steel mill (waste heat boiler) 2016 Commissioning (management) of waste heat boiler and water-steam circuit
Turkey Elazig Steel mill (waste heat boiler) 2015-2016 Commissioning of waste heat boiler, water-steam circuit and process gas cleaning system
Czech Republic Litvinov Oil refinery 2015-2016 Site management of mechanical plant systems
Bosnia-Herzegowina Lukavac/Tuzla Cement plant 2015 Commissioning of a silo complex with conveyor system
Italy Rezzato Cement plant 2015 Installation and commissioning of a silo complex with conveyor system
Germany Göllheim Cement plant 2014 Optimization of dosage and control of a silo complex with conveyor system
Brazil Rio de Janeiro Steel mill (waste heat boiler) 2010-2013 Commissioning (management) of multiple waste heat boilers incl. water-steam circuit and flue gas desulfurization (FGD) system
Germany Karlsruhe Oil refinery 2009 Commissioning of flue gas denitrification system (SCR)
Ships
Country City/Shipyard Name Type Period Project
Turkey Instanbul/Tuzla MSC Agadir Container ship 2020-2021 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Zhoushan Maran Ariadne Oil tanker 2020 Service of exhaust gas scrubber
China Qingdao Captain Petros H Bulk carrier 2020 Service of exhaust gas scrubber
China Lanshan Marmaras Aigaion Bulk carrier 2020 Service of exhaust gas scrubber
China Qinhuangdao/Shanhaiguan Koundouros Bulk carrier 2020 Service of exhaust gas scrubber
Singapore Keppel Chandris Ellinis Oil tanker 2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Taiwan Maran Virtue Bulk carrier 2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Singapore Sembcorp Maran Hero Bulk carrier 2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Egypt Kairo Delta Commander Oil tanker 2020 Service of exhaust gas scrubber
Singapore Keppel Maran Victory Bulk carrier 2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Singapore Keppel Maran Unity Bulk carrier 2020 Service of exhaust gas scrubber
Singapore Keppel Maran Venture Bulk carrier 2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Taiwan Anangel Happiness Bulk carrier 2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Singapore Sembcorp Maran Hermes Oil tanker 2020 Service of exhaust gas scrubber
Singapore Sembcorp Maran Aphrodite Oil tanker 2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Turkey Istanbul/Tuzla Maran Grace Bulk carrier 2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Singapore Sembcorp Maran Horizon Bulk carrier 2020 Service of exhaust gas scrubber
Singapore Sembcorp Maran Brilliance Bulk carrier 2020 Service of exhaust gas scrubber
Singapore Sembcorp Maran Homer Oil tanker 2020 Service of exhaust gas scrubber
Turkey Istanbul/Tuzla Maran Vigour Bulk carrier 2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Shanghai/Huarun Dadong MSC Genova Container ship 2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Shanghai/Huarun Dadong MSC Livorno Container ship 2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Shanghai/Huarun Dadong MSC Bari Container ship 2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Turkey Istanbul/Tuzla MSC Antigua Container ship 2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Shanghai/Huarun Dadong MSC Savona Container ship 2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Germany Kiel Ferry 2020 Troubleshooting and optimization of scrubber
China Shanghai/Huarun Dadong Maran Hope Bulk carrier 2019-2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Singapore Keppel Anangel Excellence Bulk carrier 2019-2020 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Singapore Sembcorp Anangel Athena Bulk carrier 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Singapore Sembcorp Maran Helen Oil tanker 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Singapore Sembcorp Maran Athena Oil tanker 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Singapore Sembcorp Maran Hercules Oil tanker 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Qinhuangdao/Shanhaiguan Maran Unity Bulk carrier 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Singapore Sembcorp Maran Arete Oil tanker 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Qinhuangdao/Shanhaiguan Marmaras Zorbas Bulk carrier 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Spain La Coruna Delta Hellas Oil tanker 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Bayuquan Marmaras Eurydice D Bulk carrier 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Qinhuangdao/Shanhaiguan Delta Sky Oil tanker 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Qinhuangdao/Shanhaiguan Maran Glory Bulk carrier 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Singapore Sembcorp Maran Ariadne Oil tanker 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Jiangyin/Chengxi Delta Ios Oil tanker 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Zhoushan Chandris Serenea Oil tanker 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Singapore Sembcorp Maran Homer Oil tanker 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Jiangyin/Chengxi Delta Commander Oil tanker 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Netherlands Rotterdam Maran Hermes Oil tanker 2019 Remaining work on exhaust gas scrubber already in operation
China Fuzhou/Kemen Marmaras Cyclades Bulk carrier 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Singapore Sembcorp Maran Hermione Oil tanker 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
South Africa Cape Town Marmaras Maria Maria Bulk carrier 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
Singapore Sembcorp Maran Hercules Oil tanker 2019 Service of exhaust gas scrubber
France Le Havre Delta Sky Oil tanker 2019 Service of exhaust gas scrubber
Turkey Adana Maran Unity Bulk carrier 2019 Service of exhaust gas scrubber
China Qinhuangdao/Shanhaiguan Maran Trust Bulk carrier 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Tianjin Marmaras Zorbas Bulk carrier 2019 Service of exhaust gas scrubber
China Bayuquan Marmaras Eurydice D Bulk carrier 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
United Arab Emirates Fudschaira Maran Arete Oil tanker 2019 Service of exhaust gas scrubber
Gibraltar Maran Future Bulk carrier 2019 Commissioning of exhaust gas scrubber incl. trial operation and acceptance by the ship’s flag administration
China Zhoushan Maran Helen Oil tanker 2019 Service of exhaust gas scrubber
Singapore Sembcorp Anangel Spirit General cargo 2019 Service of exhaust gas scrubber
Others
Country City Plant Period Project
Ukraine Tschernobyl Robot system (nuclear power plant) 2019 Installation, commissioning and optimization of robot system for removing the fuel rods from the cooling pond
Kanada Winnipeg HVDC converter station 2017 Consulting for Siemens as part of the Bipole III HVDC project
Germany Krefeld Logistics centre 2016-2017 Site management
Germany Emden Gas terminal 2014-2015 Site management of plant and piping construction as well as insulation; commissioning of gas terminal
Netherlands Rotterdam/Botlek Hydrogen plant 2011 Commissioning of overall plant
https://www.wulfenia-engineering.com/wp-content/uploads/2020/08/vector-bg-reverse4.jpg

Our clients

https://www.wulfenia-engineering.com/wp-content/uploads/2020/06/lg-6.png
https://www.wulfenia-engineering.com/wp-content/uploads/2020/06/lg-7.png
https://www.wulfenia-engineering.com/wp-content/uploads/2020/06/lg-5.png
https://www.wulfenia-engineering.com/wp-content/uploads/2020/06/lg-4.png
https://www.wulfenia-engineering.com/wp-content/uploads/2020/06/lg-3.png
https://www.wulfenia-engineering.com/wp-content/uploads/2020/06/lg-2.png
https://www.wulfenia-engineering.com/wp-content/uploads/2020/06/lg-1.png